In 2026, constructing the grey structure of a 5 Marla house with a 2,000 sq. ft. covered area requires a total investment of PKR 6,400,000.
This calculation is based on a unit cost of PKR 3,200 per square foot. Essential material requirements include 55,000 bricks at PKR 22 each, 700 bags of Bestway cement at PKR 1,400 per bag, and 3.5 tons of Grade-60 steel priced at PKR 230,000 per ton. Additional material costs include sand at PKR 396,000 and crush at PKR 264,000. Infrastructure expenses involve PKR 200,000 for water boring and PKR 120,000 for the main gate.
Labor costs are estimated at PKR 550 per square foot, totaling PKR 1,100,000 for the main contractor, plus PKR 150,000 for specialized plumbing and electrical labor. For professional project management, costs typically rise to PKR 3,500–3,600 per square foot. Contact Manahil Estate at 03455222253 or visit www.manahilestate.com for expert construction consultancy.